Architect Cemre Ece Kozbay |
Marmaris Değirmenyanı Building |
Reinforced Concrete Static Project Design |
2018 |
Akşan Yapı |
Koopera-Zekeriyaköy Houses, Reinforced Concrete Basements |
Reinforced Concrete Static Project Design |
2018 |
Manço+Hadi Architecture |
Fox Tv Hanging Floor (Mezzanine Floor Construction) |
Steel Static Project Design |
2018 |
Şebnem Kürşad Architecture |
İstanbul, Şişli District, 19 Mayıs District, 1906 Block, 80 Plot Housing |
Reinforced Concrete Static Project Design |
2018 |
Şebnem Kürşad Architecture |
Istanbul Province, Kadıköy District, Mını Eatery Restaurant (Mezzanine Floor Construction) |
Steel Static Project Design |
2018 |
Manço+Hadi Architecture |
Özsüt Restaurant Suspension Platform |
Steel Static Project Design |
2018 |
Demir Construction |
Istanbul Province, Kucukcek mece District, Sogutlucesme District, F21C21C2D Flats, 113 Plot Housing |
Reinforced Concrete Static Project Design |
2018 |
A-N Tasarım Ltd. Şti. |
Istanbul Province, Sarıyer District, Rumelihisarı Quarter, Plot 3, Block 73 , Pool 4 and Car Park (Metin Fadıllıoğlu) |
Reinforced Concrete Static Project Design |
2018 |
KNG Architecture (Architect Nigar Şenozan) |
Kocaeli Province, Başiskele District, Damlar District, Layout G23C09A3A, Block 555, Plot 10 Housing |
Reinforced Concrete Static Project Design |
2018 |
Hakan Kocaağa |
Alugen Factory, Tekirdag Province, Çorlu District, Velimeşe Free Zone |
Static Project Design of Reinforced Concrete Machine Foundation |
2018 |
Hakan Kocaağa |
Klüber Lubrication, Tekirdağ Province, Çerkezköy District, Karaağaç District, Layout 11, Block 252, Plot 9 |
Static Project Design of Reinforced Concrete Water Tank |
2018 |
Architect Dilek Şişman |
Istanbul Province, Beyoglu District, Firuzaga District, Layout 28, Block 491, Plot 9 (Apelyan Apt.) |
Analysis Report Preparation of Masonry Construction |
2018 |
Akan Architecture |
Serencebey Project – 267 Blocks, 7 Plots – Beşiktaş / İstanbul |
Reinforced Concrete Strengthening Project |
2017 |
Hızır Yllmaz |
Old Cıty Hotel – 434 Map, 1984 Block, 37 Plot – Fatih / Istanbul |
Earthquake Performance Report Preparation for Reinforced Concrete Building |
2017 |
Al-Tuğ Construction |
Ömer Faruk Çelik Project – Layout 123 , Block 94 ,Plot 7 – Beyoğlu / İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Fahri Bertan Gürkan |
Vaniköy Villas Project |
Reinforced Concrete Strengthening Project |
2017 |
Tiba Architecture |
Gerçek Otomobilcilik San. Ve Tic. Aş. – 1661 Block, 104 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Tiba Architecture |
Mlord Foreign Trade Inc. – Block 614, Plot 34 – Sarıyer / İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Tiba Architecture |
Osman Turan Building – 44 Layout, 146 Block, 32 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Tiba Architecture |
Yali Oz Insaat Taah. Tourism Jewelery And Health Inc. – Block 1661, Plot 3 – Sarıyer / İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Brik Yapı Sanayi Ve Tic. Aş. |
F22B06B3D Layout, 1659 Block, 4 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Tiba Architecture |
Seçgin Bal Ve Hissedarları – 1268 Block, 1 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Architect Şebnem Kürşat |
Nezire Olcay Taşköprü Building – 1906 Block, 80 Plot – Şişli/İstanbul. |
Reinforced Concrete Static Project Design |
2017 |
Tiba Architecture |
Metin Fadıllıoğlu – 3 Layout, 73 Block, 4 Plot |
Reinforced Concrete Pool and Car park Static Project Design |
2017 |
Abdullah Duran Ve Hissedarları |
Reinforced Concrete Building / Eminönü |
Earthquake Performance Report Preparation for Reinforced Concrete Building |
2017 |
Kameroğlu Construction |
Metrohome Mass Housing (124 and 125 Plots) |
Reinforced Concrete Static Project Design |
2017 |
Hakan Kocaağa |
Göçerler Wedding Hall / Tekirdağ |
Reinforced Concrete Static Project Design |
2017 |
Grand Yavuz Otel |
Grand Yavuz Hotel / Aksaray |
Earthquake Performance Report Preparation for Reinforced Concrete Building |
2017 |
Armağan Şamcı |
Muhammed Sedat Ünal And Shareholders (Göl Plus) – G21B01A2A Layout, 9145 Plot – Küçükçekmece / İstanbul |
Reinforced Concrete Static Project Design |
2017 |
Yoo Architecture |
Argos In Capadocia |
Reinforced Concrete Pool Static Project Design |
2017 |
Yoo Architecture |
Argos In Capadocia |
Steel Construction Static Project Design |
2016 |
Mir Construction |
Yeniköy Panayia Church Foundation |
Reinforced Concrete Static Project Design |
2016 |
Uran Badur Architecture |
Doğanca House And Hospital Fountain Structures |
Static Analysis Report preparation for Timber / Masonry Building |
2016 |
Tiba Architecture |
Mirgün Dist. – 626 Block, 218 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Seba Construction |
Rumelihisarı Dist. – 647 Block, 168 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Tiba Architecture |
Maden Dist. – 1287 Block, 11 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Tiba Architecture |
Maden Dist. – 1297 Block, 12 Plot – Sarıyer/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Tiba Architecture |
Caferağa Dist. – 23 Layout, 1142 Block, 8 Plot |
Masonry-Timber Building Static Project Design |
2016 |
Şirin Akıncı |
Rumeli Fortress Tower and Walls |
Static Analysis Report Preparation for Fortress Tower and Walls |
2016 |
Bilgili Holding |
Sinan Temo House |
Stell Construction Static Project Design |
2016 |
Ülker |
Chocolate Factory |
Stell Construction Static Project Design |
2016 |
Grup A Architecture |
Çatma Mescit Mahallesi – Hotel Structure |
Reinforced Concrete Static Project Design |
2016 |
Uran Badur Architecture |
İnecik Bath |
Earthquake Performance Report Preparation for Masonry Building |
2016 |
Sütaş |
Büyükçekmece District Office Building |
Reinforced Concrete Static Project Design |
2016 |
Bilgili Holding |
Akaretler Row Houses A Blocks RBuildingsion Projects |
Strenghtening Static Project Design for Masonry Building |
2016 |
Şenlikoğlu |
Qatar Chemical Production Plant |
Stell Construction Static Project Design |
2016 |
Protel |
No: 8 Şişli (Protel Building) |
Reinforced Concrete Strengthening Project |
2016 |
Architect Nurdan Orhan |
MBlockm Zoi Building |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2016 |
Tiba Architecture |
Eren Canbaz Building |
Timber Building Static Project Design |
2016 |
Ali Tellioğlu |
Asiye Genan – Kağıthane – Reinforced Concrete Structure |
Reinforced Concrete Strengthening Project |
2016 |
Asteknik |
Taş Yapı Okmeydani Hospital |
Steel Construction Static Project Design |
2016 |
Hisar Schools |
Gokturk Hisar Schools |
Earthquake Performance Report Preparation for Reinforcement Concrete Building |
2016 |
Erginoğlu Çalışlar Architecture |
Beyoğlu Balo Street Historical Building |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2016 |
Ahmet Sakaoğlu |
Göztepe Wood Ancient Building (Restoration) |
Timber Building Static Project Design |
2016 |
Armağan Şamcı |
Mustafa Arslan – 243Dr3B Layout, 168 Block, 17 Plot – Küçükçekmece/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Tiba Architecture |
Kemankeş Mahallesi – 120 Layout, 68 Block, 9 Plot – Beyoğlu/İstanbul |
Reinforced Concrete Static Project Design |
2016 |
Grup A Architecture |
Hacımimi Beyoğlu |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Architect Hatice Karakaya |
Euro Hotel / Beyoglu |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Architect Murat Gönençler |
Levent Villa Strengthening (Building Reinforcement) |
Reinforced Concrete Strengthening Project |
2015 |
Architect Hatice Karakaya |
HSBC Bank İstiklal Str. Branch Building |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Şirin Akıncı |
Süleymaniye 572 Block 27 Plot |
Timber Building Static Project Design |
2015 |
Şirin Akıncı |
Süleymaniye 988 Block 4 Plot |
Timber Building Static Project Design |
2015 |
Peri Kalıp A.Ş. |
Qatar Bridge Junction Steel Scaffolding Project |
Stell Construction Bridge Static Project Design |
2015 |
Tiba Architecture |
Kadıköy Wooden Building Project |
Timber Building Static Project Design |
2015 |
Grup A Architecture |
Tomtom Neighborhood / Beyoğlu |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Grup A Architecture |
Çatma Mescit Hamam Building |
Earthquake Performance Report Preparation for Masonry Building |
2015 |
Şirin Akıncı |
Bomonti |
Earthquake Performance Report Preparation for Masonry Building |
2015 |
Şirin Akıncı |
Kağıthane |
Earthquake Performance Report Preparation for Masonry Building |
2015 |
Yoo Architecture |
Zuma Restaurant / Istinye Park |
Stell Construction Static Project Design |
2015 |
Hobi Karaköy Construction A.Ş. |
Hobby Hotel / Karakoy |
Reinforced Concrete Strengthening Project |
2015 |
Nurullah Şen |
Masonry Strengthening / Fatih |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Tasarım Architecture |
Önal Tunç Building |
Reinforced Concrete Static Project Design |
2015 |
Tasarım Architecture |
Niyazi Armagan Building |
Reinforced Concrete Static Project Design |
2015 |
Armağan Şamcı |
Evshop Building |
Reinforced Concrete Static Project Design |
2015 |
Bilgili Holding |
Akaretler Row Houses E-F Blocks |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Ayşe Ilgın Necipoğlu |
Alihan Building – 4 Plates, 331 Blocks, 1 Plot – Beyoğlu / İstanbul |
Reinforced Concrete Strengthening Project |
2015 |
Şirin Akıncı |
Gebze Train Station, Main Buildings and Residences – 41th Floor, 227 Blocks, 1Plot – Gebze / Kocaeli |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2015 |
Peri Kalıp A.Ş. |
Porch Structure – 221 Blocks, 4 Plots – Esenyurt / Istanbul |
Steel Construction Static Project Design |
2015 |
Halil Onur Architecture |
Health Foundation Structures – 84 Layout, 350 Block, 25 Plot – Fatih / İstanbul |
Strenghtening Static Project Design for Masonry Building |
2015 |
Mir Architecture |
Habil Hakmi House – 1 Piece, 1245 Block, 3 Plot – Beşiktaş / İstanbul |
Reinforced Concrete Strengthening Project |
2015 |
Tiba Architecture |
Ozer Hurmaci House – 1466 Block, 30 Plot – Sariyer / Istanbul |
Reinforcement Concrete and Steel Construction Project |
2015 |
Armağan Şamcı |
Cennet Koru Evleri / Soguksu |
Reinforced Concrete Strengthening Project |
2014 |
Bilgili Holding |
Akaretler Row Houses A Blocks |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2014 |
Erginoğlu Çalışlar Architecture |
Masonry Housing / Balo Street |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2014 |
Grup A Architecture |
Yali Mansion Vakıf Han / Eminonu |
Strenghtening Static Project Design for Masonry Building |
2014 |
Orhan Ve Orhan Architecture |
Tophane Student Dormitory |
Reinforced Concrete Strengthening Project |
2014 |
Tiba Architecture |
Ayse Ilhan Inci House – Kilyos 1029 Block 5 Plot |
Reinforced Concrete Strengthening Project |
2014 |
Grup A Architecture |
5 Vakıf Han / Eminönü |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2014 |
Grup A Architecture |
894 Block 11 Plot Stack Building / Beyoğlu |
Earthquake Performance Report Preparation for Masonry Building |
2014 |
Demir Construction |
Lavida |
Reinforced Concrete Static Project Design |
2014 |
Ahmet Sakaoğlu |
Narlıyan Apartment Building / Baby |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2014 |
Hakan Kocaağa |
Vira Chemical Factory Building – G23A16C2B Plot, 144 Block, 13 Plot – Dilovası / Gebze |
Reinforcement Concrete and Steel Construction Project |
2014 |
Hakan Kocaağa |
Vira Color Factory Building – F19B22A4C Plot, 112 Block, 16 Plot – Çorlu / Tekirdağ |
Reinforcement Concrete and Steel Construction Project |
2014 |
Grup A Architecture |
Yığma Yapı – Kurabiye Street, 10th Floor, 400 Blocks, 1 Plot – Beyoğlu / İstanbul |
Strenghtening Static Project Design for Masonry Building |
2014 |
Armağan Şamcı |
Manufactoring Building – G21B13B4C Map, 50905 Block, Y17 Plot – Tuzla / Istanbul |
Reinforced Concrete Static Project Design |
2014 |
Armağan Şamcı |
Ahmet Özkan Building – F21C16B4C Map, 1337 Block, 22 Plot – Başakşehir / İstanbul |
Reinforced Concrete Static Project Design |
2014 |
Tiba Architecture |
Cevriye Nihal Cakir House – 124 Layout, 706 Block, 10 Plot – Uskudar / Istanbul |
Earthquake Performance Report Preparation for Reinforced Concrete Building |
2014 |
Tiba Architecture |
Meşrutiyet Mahallesi – F21C16B4C Layout, 1337 Block, 22 Plot – Şişli / İstanbul |
Reinforced Concrete Static Project Design |
2014 |
Tiba Architecture |
Mirgün – 621 Block, 128 Plot – Şişli / İstanbul |
Reinforced Concrete Static Project Design |
2014 |
Architectane Architecture |
Laleliçeşme Sok. Hotel Project |
Strenghtening Static Project Design for Masonry Building |
2013 |
Grup A Architecture |
Old Courthouse – Eminönü |
Strenghtening Static Project Design for Masonry-Reinforcement Concrete Building |
2013 |
Mimyapı |
Beyoğlu Wellness Center |
Reinforced Concrete Strengthening Project |
2013 |
Demir Construction |
Iron Panorama |
Reinforced Concrete Static Project Design |
2013 |
Grup A Architecture |
İnan Investment / Ayhan Işık Street |
Strenghtening Static Project Design for Masonry Building |
2013 |
Grup A Architecture |
Yeşilçam Street |
Strenghtening Static Project Design for Masonry Building |
2013 |
Grup A Architecture |
Building / Fatih |
Earthquake Performance Report Preparation for Masonry Building |
2013 |
Grup A Architecture |
Kagir Hostel |
Strenghtening Static Project Design for Masonry Building |
2013 |
Türkiye Turing Ve Otomobil Kurumu |
Soğukçeşme Street Hotels / Sultanahmet |
Strenghtening Static Project Design for Masonry-Reinforcement Concrete Building |
2013 |
Pekerler Construction |
Church of Notre Dame Du Roseari / Kadikoy |
Strenghtening Static Project Design for Masonry Building |
2013 |
Kuleli Architecture |
Şeyhosman Tomb |
Retaining Wall Static Project |
2013 |
Mehmet Tellioğlu |
Otium |
Reinforced Concrete Static Project Design |
2013 |
Grup A Architecture |
Murat Saner Kagir Building |
Strenghtening Static Project Design for Masonry Building |
2013 |
Doruk Construction |
Kagir Housing |
Earthquake Performance Report Preparation for Masonry-Reinforcement Concrete Building and Strenghtening Static Project Design |
2013 |
Pekerler Construction |
Fener Greek Patriarchate / Patriarch House |
Strenghtening Static Project Design for Masonry Building |
2013 |
Pınar Yahşi |
Reinforced Concrete Housing |
Reinforced Concrete Strengthening Project |
2013 |
Şirin Akıncı |
Bozdoğan Kemerleri Elevator Construction |
Earthquake Performance Report Preparation for Steel Construction Building |
2013 |
Şirin Akıncı |
Fethiye Museum |
Earthquake Performance Report Preparation for Masonry Building |
2013 |
Şirin Akıncı |
Pendik Train Station |
Earthquake Performance Report Preparation for Masonry Building |
2013 |
Ensa Alumınyum |
Logistic Building |
Reinforced Concrete Static Project Design |
2013 |
Architectane Architecture |
Cicekhan |
Strenghtening Static Project Design for Masonry Building |
2013 |
Gelişim Yapı |
Bağçeşme Reinforcement Concrete Buildings |
Reinforced Concrete Static Project Design |
2012 |
Gbmm Architecture |
Açıkel Hotel |
Reinforced Concrete Static Project Design |
2012 |
Grontmij |
Aysel Apartment Building |
Reinforced Concrete Static Project Design |
2012 |
Erginoğlu Çalışlar Architecture |
Beyoglu Municipality |
Strenghtening Static Project Design for Masonry Building and Steel Construction Project |
2012 |
Demir Construction |
Demirlife Premium |
Reinforced Concrete Static Project Design |
2012 |
Hs Architecture |
Protel Building |
Reinforced Concrete Static Project Design |
2012 |
Şirin Akıncı |
YTU Davutpasa Campus |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2012 |
Çamoğlu Architecture |
Villas in Iraq |
Reinforced Concrete Static Project Design |
2012 |
Hayim Beraha |
Polsan Button Factory / Pendik |
Reinforced Concrete Static Project Design |
2012 |
Hakan Kocaağa |
Corlu Wastewater Treatment Plant |
Reinforced Concrete Static Project Design |
2011 |
Demir Construction |
Ayışığı – 2 Reinforcement Concrete Buildings |
Reinforced Concrete Static Project Design |
2011 |
Grontmij |
Hasanbey Building / Taksim |
Reinforced Concrete-Masonry-Steel Construction Building Static Project Design |
2011 |
Şirin Akıncı |
İnci Denizci Building / Kuzguncuk |
Earthquake Performance Report Preparation for Masonry Building |
2011 |
Uran Badur Architecture |
Zeynep Kamil Hospital |
Strenghtening Static Project Design for Masonry Building |
2011 |
Uran Badur Architecture |
St. Benoit High School – Karaköy |
Reinforced Concrete-Masonry Building Static Project Design |
2011 |
Yoo Architecture |
Volkswagen Düzce Car Dealer |
Reinforced Concrete and Steel Static Project Design |
2010 |
Gelişim Yapı |
Sakarya Polytechnic |
Reinforced Concrete Static Project Design |
2010 |
Şirin Akıncı |
T.C. İstanbul University Main Entrance Gate – Beyazıt |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Şirin Akıncı |
Süleymaniye, Zone 2 608, 609, 610, 611, 558, 559, 572 (27 Plot) Ve 998 (4 Plot) – Fatih |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Yoo Architecture |
Nomads Bar, Ortakoy |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Lasher Tekstil |
Shop Building – Laleli |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2010 |
Akc Architecture |
Sinan Ilgaz Tünel Building – Beyoğlu |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Grontmij |
Yapi Kredi Bank, General Management Building – Beyoglu |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2010 |
Cezmi Artık |
Alınteri Building – İstanbul |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Çetin Yüce |
Bigchef Restaurant Building – Ankara |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2010 |
Midek Mingü |
Turgut Reis – D Marına |
Steel Construction Static Project Design |
2009 |
Demir Construction |
Ayışığı – 1 Reinforcement Concrete Buildings |
Reinforced Concrete Static Project Design |
2009 |
Mete Buyurgan |
Bigchef Restaurant Building – Etiler |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2009 |
Yavuz Architecture |
Bayburt University, Rectorate Building – Bayburt |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2009 |
Yavuz Architecture |
Boğaziçi University, Eta-B Block |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2009 |
Yavuz Architecture |
Gungoren Municipality Building |
Reinforced Concrete Static Project Design |
2009 |
Gelişim Yapı |
Sakarya University Sports Facility Building |
Steel Construction-Reinforcement Concrete Building Static Project Design |
2008 |
Uran Badur Architecture |
Esbe Primary School Building |
Reinforced Concrete Static Project Design |
2008 |
Uran Badur Architecture |
Pierre Lotti High School – Beyoğlu |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2008 |
Muammer Giyimli |
Masonry – Taksim |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2008 |
Uran Badur Architecture |
Mudoravuna Building – Taksim |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2008 |
Midek Mingü |
Doğuş Holding Headquarters – Kuzguncuk |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2008 |
Uran Badur Architecture |
Sweden Istanbul Consulate Building – Taksim |
Earthquake Performance Report Preparation for Masonry Building and Strenghtening Static Project Design |
2008 |
Rukiye Devres |
Devreshan Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2008 |
Gelişim Yapı |
Gebze Cultural Centre |
Reinforced Concrete Static Project Design |
2008 |
Tan Construction |
Aras Four Star Hotel / İran |
Reinforced Concrete Static Project Design |
2008 |
Midek Mingü |
Doğuş Power Center / NTV Studios |
Stell Construction Static Project Design |
2008 |
Sinpaş |
Avangarden Residence |
Reinforced Concrete Static Project Design |
2007 |
Mete Buyurgan |
İstinyepark Guccı facade |
Stell Construction Static Project Design |
2007 |
Demir Construction |
Narçiçeği Reinforcement Concrete Buildings |
Reinforced Concrete Static Project Design |
2006 |
Ağma Construction |
Mediterrenean University Psychiatry Hospital |
Reinforced Concrete Static Project Design |
2006 |
Armağan Şamcı |
Vardem Toys and Souvenir Factory Building |
Reinforced Concrete Static Project Design |
2006 |
Armağan Şamcı |
Oksuzogulları Business Center |
Reinforced Concrete Static Project Design |
2005 |
Oğuz Bayazit Architecture |
Jinemed Health Service Building |
Reinforced Concrete Static Project Design |
2005 |
Tan Construction |
Ahmet Tangudur Villa Project |
Reinforced Concrete Static Project Design |
2005 |
Tan Construction |
Taimex Chocolate Factory |
Reinforced Concrete Static Project Design |
2004 |
Tan Construction |
Reba Kağıt – Store Building |
Reinforced Concrete Static Project Design |
2004 |
Tan Construction |
İliyev Yaşayış Building |
Reinforced Concrete Static Project Design |
2004 |
Tan Construction |
Taimex Chocolate Factory |
Reinforced Concrete Static Project Design |
2004 |
Beko |
Beko Beylikdüzü Factory Main Entrance Security Building |
Reinforced Concrete Static Project Design |
2004 |
Beko |
Beko Beylikdüzü Factory Conveyor unit |
Reinforced Concrete Static Project Design |
2004 |
Beko |
Beko Beylikdüzü Factory Main Entrance Building |
Reinforced Concrete Static Project Design |
2004 |
Beko |
Beko Beylikdüzü Factory Store Building |
Reinforced Concrete Static Project Design |
2004 |
Karataş Tekstil |
Karataş Tekstil – Store Building |
Reinforced Concrete Static Project Design |
2004 |
Apartment Building Management |
Peksayar Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2004 |
İsmail Çelik |
Şişecam Soda Sanayi A.Ş. Mersin Factory |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2004 |
İsmail Çelik |
İzzet Menase Building |
Reinforced Concrete Static Project Design |
2004 |
İsmail Çelik |
İsmail Fahrettin Tivnikli Project |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2004 |
Şahinler Holding |
Şahinler Holding Mezzanine project |
Reinforced Concrete Static Project Design |
2004 |
Manço+Hadi Architecture |
Teco Polimer A.Ş. Mezzanine Project |
Reinforced Concrete Static Project Design |
2004 |
Gelişim Yapı |
S.Ü. Hendek Vocational School |
Reinforced Concrete Static Project Design |
2004 |
Gelişim Yapı |
S.Ü. Esentepe Campus Technical Education Faculty |
Reinforced Concrete Static Project Design |
2004 |
Armağan Şamcı |
Kartek Madeni Eşya A.Ş. |
Reinforced Concrete Static Project Design |
2004 |
Uran Badur Architecture |
Bolu Municipality |
Reinforced Concrete Static Project Design |
2004 |
Ağma Construction |
Lions Mentally Disabled Education Center |
Reinforced Concrete Static Project Design |
2003 |
TMMOB |
Ataköy High School |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2003 |
Çiçek Construction |
Avcılar Abdülkadir Uztürk Primary School |
Reinforced Concrete Static Project Design |
2003 |
Apartment Building Management |
Sabuncugil Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2003 |
Business Center Management |
Vepa Center |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2003 |
Hikmet Balcı |
Hikmet Balcı |
Reinforced Concrete Static Project Design |
2003 |
İsmail Çelik |
Mersin Enternasyonel Otelcilik A.Ş – Hotel Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2003 |
Rabia Kalay |
Rabia Kalay |
Reinforced Concrete Static Project Design |
2003 |
Ağma Architecture |
Sarıyer Yusuf Ziya Öniş – Stadium Project |
Reinforced Concrete Static Project Design |
2003 |
Uran Badur Architecture |
Uran Badur Store Building |
Reinforced Concrete Static Project Design |
2002 |
Standart Dekorasyon Ltd. Şti. |
Standart Dekorasyon Ltd.Şti. |
Reinforced Concrete Static Project Design |
2002 |
İsmail Çelik |
Büyükada Aquatic Sports Society |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2002 |
Erkan Ağma |
Erkan Ağma – Villa |
Reinforced Concrete Static Project Design |
2002 |
Armağan Şamcı |
Evkur Bayrampaşa – Shopping Center |
Reinforced Concrete Static Project Design |
2002 |
Uran Badur Architecture |
Lape Hospital |
Reinforced Concrete Static Project Design |
2002 |
İsmail Çelik |
Acarlar Danone Building |
Reinforced Concrete Static Project Design |
2002 |
Ağma Construction |
Ko.Ü. İtfayecilik High School |
Reinforced Concrete Static Project Design |
2002 |
İsmail Çelik |
Fatih Terim – Villa |
Reinforced Concrete Static Project Design |
2002 |
Ağma Construction |
Ko.Ü Arslanbey Campus Dining Hall |
Reinforced Concrete Static Project Design |
2002 |
Ağma Construction |
Ko.Ü. Aviation Vocational School Building |
Reinforced Concrete Static Project Design |
2002 |
Murat Ülker |
Murat Ülker – Villa |
Reinforced Concrete Static Project Design |
2002 |
Beko |
Beko Beylikdüzü – Nursery Building |
Reinforced Concrete Static Project Design |
2002 |
Beko |
Beko Beylikdüzü – Dining Hall Building |
Reinforced Concrete Static Project Design |
2002 |
Ağma Construction |
Bakırköy Municipality Ataköy Teacher Social Facility Building |
Reinforced Concrete Static Project Design |
2002 |
Murat Saner |
Murat Saner – Relic Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2001 |
Mono Architecture |
Sika – Administrative Building |
Reinforced Concrete Static Project Design |
2001 |
Mono Architecture |
Sika – Store Building |
Reinforced Concrete Static Project Design |
2001 |
Şükrü Genç |
Edirne Museum Building |
Reinforced Concrete Static Project Design |
2001 |
Hakan Kocaağa |
Flokser Tekstil A.Ş. – Condensing Unit Building |
Reinforced Concrete Static Project Design |
2001 |
Hakan Kocaağa |
Flokser Tekstil A.Ş. – Administrative Building |
Reinforced Concrete Static Project Design |
2001 |
Hakan Kocaağa |
Flokser Tekstil A.Ş – Wastewater Treatment Plant Building |
Reinforced Concrete Static Project Design |
2001 |
Mono Architecture |
Solmaz Gümrükleme – Store Building |
Reinforced Concrete Static Project Design |
2001 |
Mono Architecture |
Solmaz Gümrükleme – Administrative Building |
Reinforced Concrete Static Project Design |
2001 |
Sika A.Ş. |
Sika – Factory Building |
Reinforced Concrete Static Project Design |
2001 |
Armağan Şamcı |
Evkur – Business Center |
Reinforced Concrete Static Project Design |
2001 |
Armağan Şamcı |
Hüsnü Ayık – Reşit Ayaz – Business Center |
Reinforced Concrete Static Project Design |
2001 |
Eczacıbaşı İlaç |
Eczacıbaşı Safalosporin Extension Unit |
Reinforced Concrete Static Project Design |
2001 |
Eczacıbaşı İlaç |
Eczacıbaşı Penisilin Extension Unit |
Reinforced Concrete Static Project Design |
2001 |
Çalışkanlar Otomotiv |
Çalışkanlar Otomotiv – Volkswagen Plaza |
Reinforced Concrete Static Project Design |
2001 |
Ağma Construction |
Akdeniz University Rehabilitation and Geriatrics Center |
Reinforced Concrete Static Project Design |
2001 |
Buildings Management |
Gülerman Buildings |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Alcatel Kablo |
Alcatel Kablo – Store Building |
Reinforced Concrete Static Project Design |
2000 |
Şirin Akıncı |
Hıfzıssıha Institute Building |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Cooperative Management |
Zümrüt Evler – Building Society |
Reinforced Concrete Static Project Design |
2000 |
Çiçek Construction |
Ümraniye Uzun Mehmet Primary School Annex |
Reinforced Concrete Static Project Design |
2000 |
Cooperative Management |
Uyum Konut – Building Society |
Reinforced Concrete Static Project Design |
2000 |
Ağma Construction |
Bakırköy Municipality Sports Facility |
Reinforced Concrete Static Project Design |
2000 |
Babür Borhan |
Bostancı Yalı Apartment |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Apartment Building Management |
Yeşilköy Neşe Apartment |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Apartment Building Management |
Kadıköy Aksu Apartment |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Çiçek Construction |
Yunus Emre Primary School |
Reinforced Concrete Static Project Design |
2000 |
Apartman Yönetimi |
Kadıköy Dilek Apartment |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
2000 |
Ağma Construction |
Yeşilbayır Merkez Science High School |
Reinforced Concrete Static Project Design |
2000 |
Apartman Yönetimi |
Kadıköy Samet Apartment |
Earthquake Performance Report Preparation for Reinforced Concrete Building and Static Project Design |
1999 |
Ağma Construction |
Çatalpınar Police Station and Service Building |
Reinforced Concrete Static Project Design |
1999 |
İnterçağla Tekstil |
İnterçağla Textile Headquarters Building |
Reinforced Concrete Static Project Design |
1999 |
Mono Architecture |
Gima Didim Shopping Center |
Reinforced Concrete Static Project Design |
1999 |
Ağma Construction |
Kumluca Seracılık – Technopark Center |
Reinforced Concrete Static Project Design |
1999 |
Sistem Reklamcılık |
Sistem Reklamcılık – Headquarters Building |
Reinforced Concrete Static Project Design |
1999 |
Kooperatif Tönetimi |
San-1-Sanayicileri – Building Society |
Reinforced Concrete Static Project Design |
1999 |
Ağma Construction |
Şebinkarahisar Dormitory Building |
Reinforced Concrete Static Project Design |
1998 |
Geta Construction |
Bakırköy Municipality Maternity Hospital |
Reinforced Concrete Static Project Design |
1998 |
Ağma Construction |
Akdeniz University Engineering Faculty |
Reinforced Concrete Static Project Design |
1998 |
Armağan Şamcı |
İkitelli Evkur – Business Center |
Reinforced Concrete Static Project Design |
1997 |
Ağma Construction |
Demre Ayışığı Holiday Site |
Reinforced Concrete Static Project Design |
1997 |
Tellioğlu Group |
Tellioğlu Residence and Offices |
Reinforced Concrete Static Project Design |
1997 |
Tellioğlu Group |
Tellioğlu Residence and Business Center |
Reinforced Concrete Static Project Design |
1996 |
Fahri Kuz |
Fahri Kuz – Hospital |
Reinforced Concrete Static Project Design |
1996 |
Salih Baduk |
Salih Baduk – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
İbrahim Keçeci |
İbrahim Keçeci – Villa |
Reinforced Concrete Static Project Design |
1996 |
Ünal Conta |
Ünal Conta A.Ş. – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Faga Construction |
Migiboy Textile Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Çiçek Construction |
Tacirler Eğitim Vakfı – Primary School |
Reinforced Concrete Static Project Design |
1996 |
Ali Yalçın |
Ali Yalçın Residence Project |
Reinforced Concrete Static Project Design |
1996 |
Murat Saner |
Murat Saner Apartment Blocks – Azerbaijan |
Reinforced Concrete Static Project Design |
1996 |
Bekir Abay |
Bekir Abay Residence Project |
Reinforced Concrete Static Project Design |
1996 |
Zaralı Deri A.Ş. |
Zaralı Deri A.Ş. – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Ali Yüksel Coşkun |
Ali Yüksel Çoşkun – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Armağan Şamcı |
İstoç Social Facility |
Reinforced Concrete Static Project Design |
1996 |
Uran Badur Architecture |
Bizim Çiftlik – Villa |
Reinforced Concrete Static Project Design |
1996 |
Kooperatif Birliği |
Yakuplu Kooperatif Birliği – Business Center |
Reinforced Concrete Static Project Design |
1996 |
Musa Silsüpür |
Musa Silsüpür – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Armağan Şamcı |
Muammer Ağım Aşkabat – Business Center |
Reinforced Concrete Static Project Design |
1996 |
Armağan Şamcı |
Şahnur Tekstil A.Ş. – Factory Building |
Reinforced Concrete Static Project Design |
1996 |
Ava Construction |
Ava İnşaat – Villa |
Reinforced Concrete Static Project Design |
1995 |
Armağan Şamcı |
Onur Ağım – Business Center |
Reinforced Concrete Static Project Design |
1995 |
Marmara Construction |
Haramidere Sanayi Sitesi – Business Center |
Reinforced Concrete Static Project Design |
1995 |
Aseda Konut Yapı Kooperatifi |
Aseda Konut – Building Society |
Reinforced Concrete Static Project Design |
1995 |
Bisaş Tekstil |
Onura Hotel Social Facility |
Reinforced Concrete Static Project Design |
1995 |
Ali Yılmaz |
Ali Yılmaz – Residence Project |
Reinforced Concrete Static Project Design |
1995 |
Dolunay Konut Yapı Kooperatifi |
Dolunay Konut – Building Society |
Reinforced Concrete Static Project Design |
1994 |
Galeri Konut Yapı Kooperatifi |
Galeri Konut – Building Society |
Reinforced Concrete Static Project Design |
1994 |
Kadın Emeğini Değerlendirme Vakfı |
Kadın Emeğini Değerlendirme Vakfı |
Reinforced Concrete Static Project Design |
1994 |
Arpaş A.Ş. |
Arpaş A.Ş. – Factory Building |
Reinforced Concrete Static Project Design |
1994 |
Tellioğlu Group |
Tellioğlu Business Center |
Reinforced Concrete Static Project Design |
1994 |
Avni Sarı |
Avcılar Residence Project |
Reinforced Concrete Static Project Design |
1994 |
Mono Architecture |
Asım Barlar – Villa |
Reinforced Concrete Static Project Design |
1994 |
Hülya Tatar |
Hülya Tatar – Factory Building |
Reinforced Concrete Static Project Design |
1994 |